Installation of 60KWp Integrated Solar Renewable Power System at Computer Base Test (CBT) Center at Mbato Secondary School in Umungalagu, Eziama Nvosi. The project kicked off 17th March 2025 and was completed on 16th June 2025.
Installation of 60KWp Integrated Solar Renewable Power System at Computer Base Test (CBT) Center at Mbato Secondary School in Umungalagu, Eziama Nvosi. The project kicked off 17th March 2025 and was completed on 16th June 2025.