Skip to content

Grid Extension + Installation of 500 Kva /33/0.415kv Transformer

  • by

Substation + Reticulation – Federal Poly, Isuochi – Umunneochi

Other Locations

  • Grid Extension + Installation of 500 Kva /33/0.415kv Transformer Substation + Reticulation – Federal Poly, Isuochi – Umunneochi
  • Installation 1 X 300kva 33/0.415 Kv Transformer – NYSC Camp – Igbere – Bende
  • Installation 1 X 500kva 33/0.415 Kv Transformer Substation + Reticulation – Abia State College of Education Technical – Arochukwu
  • Grid Extension + Installation of 1 X 500 kva Transformer Substation – MCC Hospital – Ugwunagbo
  • Revamp of 2,5MVA Substation – ABSU – Uturu – Isuikwuato

Leave a Reply

Your email address will not be published. Required fields are marked *