This a 60KWp solar powered project installed at the computer-based test center with a sitting capacity of 300 fitted with >300 networked computer system. The center can be used for CBT examinations for JAMB, Police, Nursing Council, WAEC and NECO.

Project Components:
- 50KW Hybrid Inverter
- 60KWp Solar Panels
- 50KWH Lithium Battery Energy Storage System
- 8 X Solar panels powering submersible and surface pumps.
- A composite filtration system compliant with the WHO standards for portable drinking water.