Skip to content

200KWp / 100KW / 100KWh Solar Power Solution

  • by

Project Location : Sustainable Development Goal Multipurpose Hospital – Ugwunagbo LGA

This project covers the installation of a 100kW inverter, 200kWp solar panels, and a 100kWh battery energy storage system at SDM Hospital, Obohia, Abia State. The project aims to provide reliable and sustainable energy, enhancing the hospital’s operational efficiency and is designed to meet His Excellency’s goal of powering health facilities with solar energy while reducing reliance on-grid electricity, decreasing diesel consumption, and promoting sustainability.

Key Components

  • Inverter Capacity – 100Kw
  • Battery Capacity – 100 kWh
  • Solar Panel Capacity – 200 kWp
  • Daily Energy Generation – 433.2 kWh
  • Battery Backup Time – Up to 3 hours
  • Renewable Energy Fraction 29%
  • 5-year comprehensive warranty on parts and labor.
  • Bi-annual maintenance checks included for the first year.
  • Staff Training

Leave a Reply

Your email address will not be published. Required fields are marked *