Skip to content

WATER REVAMP Project Location : ABSU – Isuikwuato

  • by

(Phase I)

  • Construction of (3) new Elevated Water Tank on steel stanchion with installation of 4 X3000L GP Tanks
  • Rehabilitation of the Four (4) existing intervention boreholes with installed pumps covering Hostels C, E, F, G, H.
  • Installation 8 X 450 Watts Solar Panels for each borehole location
  • Reticulation of water supply to Hostels C and H

Leave a Reply

Your email address will not be published. Required fields are marked *