(Phase I)
- Construction of (3) new Elevated Water Tank on steel stanchion with installation of 4 X3000L GP Tanks
- Rehabilitation of the Four (4) existing intervention boreholes with installed pumps covering Hostels C, E, F, G, H.
- Installation 8 X 450 Watts Solar Panels for each borehole location
- Reticulation of water supply to Hostels C and H