Department of Power
Abia Power Sector
Abia State is one of the economic drivers of the country as it has one of the largest markets in sub-Saharan Africa. An essential component that enables these businesses thrive is Power supply.
Proactively on February 26, 2024, the Abia state government in partnership with Geometric Power Limited commissioned the 188MW Geometric Power Plant and APL Electric Company Ltd to energize 9 out of 17 L.G.A in the Aba Ring Fenced Area.
In the Ariaria International Market, Aba, Abia State, Nigeria, the 9.5 megawatts (MW) Ariaria IPPP is licensed to provide a dedicated, reliable electricity supply to the market. It consists of a gas-fired power plant and a distribution network designed to power shops in the market .
Abia State Government is in discussions with EEDC on a collaboration to improve power infrastructure to energize the remaining 8 local government areas. Inline with EA 2023, ABSG has passed into law the Abia Electricity Law and has gone ahead to set up Abia State Electricity Regulation Authority (ASERA).
Several initiatives are ongoing to use clean and renewable energy sources to increase energy access to unserved and underserved locations in the state. The state’s Mini grid regulation is also ready.
Abia Power Sector
Abia State is one of the economic drivers of the country as it has one of the largest markets in sub-Saharan Africa. An essential component that enables these businesses thrive is Power supply.
Proactively on February 26, 2024, the Abia state government in partnership with Geometric Power Limited commissioned the 188MW Geometric Power Plant and APL Electric Company Ltd to energize 9 out of 17 L.G.A in the Aba Ring Fenced Area.
In the Ariaria International Market, Aba, Abia State, Nigeria, the 9.5 megawatts (MW) Ariaria IPPP is licensed to provide a dedicated, reliable electricity supply to the market. It consists of a gas-fired power plant and a distribution network designed to power shops in the market .
Abia State Government is in discussions with EEDC on a collaboration to improve power infrastructure to energize the remaining 8 local government areas. Inline with EA 2023, ABSG has passed into law the Abia Electricity Law and has gone ahead to set up Abia State Electricity Regulation Authority (ASERA).
Several initiatives are ongoing to use clean and renewable energy sources to increase energy access to unserved and underserved locations in the state. The state’s Mini grid regulation is also ready.
Programs & Initiatives
40KWp/20KW/20KWh Solar Power Solution
20KWp/20KVA/20KWh Solar Power Solution
40KWp/20KW/20KWh Solar Power Solution
150 KVA SOLAR POWER SYSTEM
Pediatrics, ICU, Laboratory and Eye Clinic
Theatre
200KWp / 100KW / 100KWh Solar Power Solution
200KWp / 100KW / 100KWh Solar Power Solution
200KWp / 100KW / 100KWh Solar Power Solution
60Kwp Solar Power CBT Centre
60Kwp Solar Power CBT Centre
60Kwp Solar Power CBT Centre
27KWp/20KW/ 20KWh Solar Power Solution
Ongoing Projects
Completed Projects
ABA
- Grid Extension + Installation of 1 X 500KVA/33/0.415 Transformer Substation – General Hospital
- Grid Extension + Installation of 1 X 300 kva Transformer Substation – Enyimba Garments
- Installation of 2 X 500KVA/33/ Transformer ABSUTH / Medical College – Aba
- Upgrade of 1 X 200KVA/33 transformer – Governor’s lodge – Aba


UMUAHIA
- Grid Extension + Installation of 1Mva /33/0.415kv Transformer Substation – State Secretariat
- Installation 1 X 500kva 33/0.415 Kv Transformer – Emeka Omeruah Guest House
- Grid Extension + Installation of 1 X 500KVA /33/0.415 Kv Transformer Transformer Substation – Commissioner’s Quarters
- Grid Extension + Installation of 1 X 500kva/ 33/0.415 Kv Transformer Transformer – JAAC Building
- Installation 1 X 500kva 33/0.415 Kv Transformer – Specialist & Diagnostic Centre
- Installation of 1 X 300Kva /33/0.415KV transformer -ASOPADEC
OTHER LOCATIONS
- Grid Extension + Installation of 500 Kva /33/0.415kv Transformer Substation + Reticulation – Federal Poly, Isuochi – Umunneochi
- Installation 1 X 300kva 33/0.415 Kv Transformer – NYSC Camp – Igbere – Bende
- Installation 1 X 500kva 33/0.415 Kv Transformer Substation + Reticulation – Abia State College of Education Technical – Arochukwu
- Grid Extension + Installation of 1 X 500 kva Transformer Substation – MCC Hospital – Ugwunagbo
- Revamp of 2,5MVA Substation – ABSU – Uturu – Isuikwuato
- Grid Extension , Installation of 1 X 500Kva/33/0.415Kv Transformer Substation + Reticulation – Fortune Well Farms & Environs – Mbutu – Isiala Ngwa South
- Installation of 1X300KVA 33/0.415 KV Transformer – Eze Aro palace – ArochukwuIII.Installation of 1X300KVA 33/0.415 KV Transformer – Civic Centre – Arochukwu
- Installation of 1X500KVA 33/0.415 KV Transformer – Jumbo Ofo – Arochukwu
- Installation of 100Kva /33/0.415KV Transformer @ EZE Nelson Palace and Environs – Isieketa – Isiala Ngwa South
- Rehabilitation of Vandalized Transformer Substation at Isingwu – Umuahia North
- Procurement and Distribution of Transformers (53) of various capacities to Communities in the state
- Rehabilitation of 300KVA 33/0.415KV Transformer substation at Ndi Alicho- Arochukwu
- Power Restoration / Installation of 1 X 300kva 11/0.400 Transformer sub-station – World Bank Estate Ext – Umuahia North
- Installation of 1X1000KVA 11/0.415 KV Transformer – Umuahia City – Umuahia North



Ongoing Projects
117.kWp | 100KW | 215 kWh Solar Power
- Location: BCA – Umuahia
- Status: In progress
20KWp | 20kva | 15kwh Solar Power Solution
- Location: DSS HQ – Umuahia
- Status: In progress
15.5kWp | 10KVA | 10 kWh Solar Power Solution
- Location: Abia Orientation Agency – Umuahia
- Status: in progress
Power Restoration - Ohafia
- Routing of 33 KV line from Ihechiowa to Asaga DS (27.69Km) in progress
Power Restoration Ukwa West
Power Restoration Abam & Environs
Power Restoration Nvosi Communities
- Routing of vandalized 8km X 33kv HT tower line through Old Aba Umuahia Road, 8km from Ndiolumbe – UmunkpeyiJunction – in progress
- Installation 1 X 500Kva /33/0.415KV Transformer @Okpuala Ekele in progress
Grid Extension Off Ochendu Bypass – Umuahia North
Photo Gallery
ABSU Power Restoration Project Phase 2
ABSU Power Restoration Project Phase 2
ABSU Power Restoration Project Phase 2
Grid Extension Extension – Off Ochendu By-pass
Grid Extension Extension – Off Ochendu By-pass
Grid Extension Extension – Off Ochendu By-pass
Before
Before