Skip to content

60KWP SOLAR POWER SOLUTION CBT Centre – Mbato Secondary Sch – Isiala Ngwa South

  • by

This  a 60KWp solar powered project installed at the computer-based test center  with a sitting capacity of 300 fitted with >300 networked computer system. The center can be used for CBT examinations for JAMB, Police, Nursing Council, WAEC and NECO.

Project Components:

  • 50KW Hybrid Inverter
  • 60KWp Solar Panels
  • 50KWH Lithium Battery Energy Storage System
  • 8 X Solar panels powering submersible and surface pumps.
  • A composite filtration system compliant with the WHO standards for portable drinking water.

Leave a Reply

Your email address will not be published. Required fields are marked *